Some indispensable equipment in mining process

Some indispensable equipment in mining process

The stirring tank is mainly composed of the following parts: The mixing tank, it is a container which is used to hold the stirring slurry. The spindle component, which is a rotating vertical axis with stirrer (stirring round). The motor and the transmission device, its transmission way has belt transmission and gearbox transmission. The auxiliary component, such as support beam, feeding pipe, discharging pipe, loop tube, the baffle on the slurry wall, and so on.
In the cement industrial production, to improve the efficiency of the grinding system and reduce the energy consumption of the products, the circuit grinding system is now commonly used. As the very important component of the system, the performance of the dust collector has direct impact on the working efficiency of the system. Therefore, the research work about the dust catcher has been the emphasis of research institutes and industrial and mining enterprises. The efficient compound raw material dedicated dust collector is a kind of new generation of dust collector equipment. The technical staffs of Henan Hongxing Mining Machinery combine with the advanced dust collector technology at abroad and well apply the plane vortex theory to the cyclone dust collector. The use has proven that the separating efficiency can be up to 80% to 85%. In addition, the fineness adjustment is flexible and the performance is reliable.
The mixer should impose secondary leakage protection; after switching on the powder, please carefully check the machine until the empty test to be qualified. In commissioning process, it is necessary to check whether the rotational speed of the mixing drum is appropriate; under normal circumstances, the speed of empty car is slightly faster than loaded car 2 to 3 rpm, if differ largely, please adjust the proportion between traction wheel and driving wheel. Drum rotation direction should be consistent with the direction of the arrow, or, please correct motor wiring.Check the flexibility and reliability of drive clutch and brake, the damage of rope, the state of track pulley, the barrier around accessibility and the lubrication of every part. Having started machine, please pay attention to the normal functioning of various parts. And check whether the mixer blades are bent, screw is knocked out or loosen after stopping the machine. When the concrete mixing is completed or stop machine more than 1h, please weed out the excessive stock and keep the machine clean. Please cut off the electricity supply and lock the switch box to ensure safety when stop machine.
 

Leave a Reply

You must be logged in to post a comment.